The Las Palmas I plant began operations in 1998 and was acquired by International Power Services in 2021. Located in Esquintla and connected to the INDE Escuintla I substation, Las Palmas I provides the people of Guatemala with 65 MW of firm capacity, ensuring a reliable power supply every day.
The Las Palmas I plant helps provide the Guatemalan electrical system with reliable power in the case of sudden demands or plant failures through a heavy-fuel-oil plant paired with Wartsila internal combustion engines and five air-cooled ABB generators. It is connected to the INDE Escuintla I substation.
Located on a 2.4-hectare plot in Escuintla, the thermal plant is connected to the National Grid through the Escuintla I substation with a 230 kV voltage.
It is comprised of:
5 Avenida 5-55, Zona 14,
Edificio Europlaza Torre 3, Nivel 12,
Oficina 1203
Guatemala City, Guatemala
© 2025 International Power Services
Convergence Center
Since 2021, IPS has had a significant role in the creation of the Convergence Center, an effort formed through the partnership of the Ministry of Public Health and Social Welfare, COCODE, and Orazul to help strengthen the services provided at the Social Clinic in Parcelamiento Arizona. IPS has aided in the Convergence Center’s work, including a full renovation of medical facilities, providing upgraded medical equipment, additional health services and resources for children and families, and access to immunizations for the inhabitants of the neighborhoods surrounding the Arizona Power Plant.
Local Recreational Basketball
Building at your budget with quality construction
1080 Brickell Ave - Miami
United States of America
info@construction.com
Consultancy +1 473 483 384
Planning +1 395 393 595